For the needs of the presidency of the Council of the European Union in 2020 by Croatia, it was necessary to put into operation part of the space in the NSK, which until then had been in Roh-Bau. As part of the project documentation, CTP PROJEKT has made amendments to the design of the smoke extraction and heat dissipation system, as one of the key fire protection systems.
