On August 7, 2020, a contract was signed with ROUTING d.o.o. from Banja Luka, Bosnia and Herzegovina on the preparation of part of the project documentation for the highway Budva Bypass in Montenegro. The Budva Bypass is 30 km long and consists of 3 sections: North (about 8 km long), Middle (about 13 km long) and South (about 9 km long). There are 10 tunnels on the highway. For the client, the company ROUTING, ventilation projects (mechanical part) and fire protection projects for tunnels will be prepared. It is planned to develop a joint conceptual design for all tunnels on the bypass and individual main design for three tunnels on the Middle Section.